Intel Client & Server CPU Roadmap Updates: Meteor Lake In 2023, 20A & 18A Powered Xeons & Core Chips Beyond 2024

Feb 17, 2022 at 12:36pm EST

In addition to its graphics update, Intel also announced its new client and server CPU roadmap which encompasses its Core and Xeon chips.

Intel Client 'Core' & Server 'Xeon' CPU Roadmap Unveiled: 5nm Manufacturing In 2H 2022, 3nm In 2H 2023, 20A In 1H 2024 & 18A In 2H 2024

The latest Technology roadmaps and milestones shown by Intel give a rundown of their upcoming products from the Client and Server divisions. Intel states that they are on track to reclaim the perf per watt leadership by 2025 and have shown a range of products that will help them achieve this ambitious goal.

Related Story Intel Sets Panther Lake “Core Ultra 300” CPU Volume Launch For 2026, Full Production Commencing Later This Year

Intel remains on track to reclaim transistor performance per watt leadership by 2025. Intel’s advanced test and packaging technologies give it unmatched industry leadership that benefits its products and foundry customers and will play a critical part in the pursuit of Moore’s Law. Continuous innovation is the cornerstone of Moore’s Law, and innovation is very much alive and well at Intel.

via Intel

Intel Process Roadmap

Process NameIntel 14A-EIntel 14AIntel 18AIntel 20AIntel 3Intel 4Intel 7Intel 10nm SuperFin
Production202720262H 20241H 20241H 20232H 2022In Volume (Now)In High-Volume (Now)
Perf/Watt (over 10nm ESF)TBATBATBA>20%?18%20%10-15%N/A
EUVTBDHigh-NA EUVYesYesYesYesN/AN/A
Transistor ArchitectureTBDTBDOptimized RibbonFETRibbonFETOptimized FinFETOptimized FinFETOptimized FinFETFinFET
ProductsTBDTBDNova Lake
Panther Lake
Clearwater Forest
Diamond Rapids?
Foundry Partner
Lunar Lake
Arrow Lake
Diamond Rapids?
Granite Rapids
Sierra Forest
Foundry Partner
Meteor Lake
Xe-HPC / Xe-HP?
Alder Lake
Raptor Lake
Sapphire Rapids
Emerald Rapids
Xe-HPG?
Tiger Lake

Intel Client CPU Roadmap

Starting with the Intel Client CPU roadmap, the company has already launched its Alder Lake CPU lineup, and its follow-up, the 13th Gen Raptor Lake lineup is on track for launch later this year. For Raptor Lake, 24 cores and 32 threads have been confirmed (8+16). The blue team is also promising up to double-digit performance gains, enhanced overclocking support, a new AI M.2 support, and socket compatibility with the Alder Lake platform (LGA 1700/1800).

CCG Roadmap Updates – Building upon its leadership products today, Intel’s roadmap for next-generation client products includes:

The next update to the Client CPU roadmap will come in the form of Meteor Lake which is scheduled for manufacturing on the 'Intel 4' process node in 2H 2022 and expected for launch in 2023. The 'Intel 4' node will deliver 20% performance per watt improvement and will be the first to use EUV technology, offering a significant increase in density over 'Intel 7' (10nm ESF). Intel will also be launching a follow-up to Meteor Lake in 2024 known as Arrow Lake.

Both Meteor and Arrow Lake CPUs will feature several different core IPs composed of Intel 4 (Meteor Lake), Intel 20A (Arrow Lake), and TSMC's N3 (Arc GPU / SOC) process node. What's particularly interesting is that starting Meteor Lake, the new CPUs will feature a Tiled-GPU design featuring Arc graphics architecture. Raja Koduri states that this 'tGPU' will be unlike anything previously done on client CPUs and will be different than discrete and integrated graphics designs.

Moving beyond 2024, Intel plans to offer a major overhaul to its Client platform with Lunar Lake and Nova Lake chips. These will likely be scheduled for 2025 and 2026 releases, respectively. The next-generation CPUs will come within a tiled-CPU architecture, featuring an MCM CPU, SOC, and GPU IPs integrated on the same package. Both Lunar Lake &  Nova Lake chips are expected to utilize the improved 18A node which will offer an additional 10% improvement in performance per watt and add more enhancements to the RibbonFET architecture. The manufacturing is scheduled for 1H 2024 for 20A and 2H 2024 for 18A chips. Other core IPs will be relying on external foundry nodes.

As you can see from the roadmap block diagrams, the next-gen Client platforms will be utilizing a fully-integrated MCM design, making use of several chiplets that will be integrated on the same CPU package. All in all, the following is the node-specific to the chiplet count we can expect on future client chips from team blue:

Intel Mainstream CPU Generations Comparison:

Intel CPU FamilyProcessor ProcessProcessor ArchitectureGraphics ArchitectureProcessors Cores/Threads (Max)PlatformMemory SupportPCIe SupportLaunch
Alder Lake (12th Gen)Intel 7Golden Cove (P-Core)
Gracemont (E-Core)
HD 700 Series16/24LGA 1700/1800DDR5 / DDR4PCIe Gen 5.02021
Raptor Lake (13th Gen)Intel 7Raptor Cove (P-Core)
Gracemont (E-Core)
HD 700 Series24/32LGA 1700/1800DDR5 / DDR4PCIe Gen 5.02022
Raptor Lake Refresh (TBA)Intel 7Raptor Cove (P-Core)
Gracemont (E-Core)
HD 700 Series24/32LGA 1700/1800DDR5 / DDR4PCIe Gen 5.02023
Meteor LakeIntel 4Redwood Cove (P-Core)
Crestmont (E-Core)
Xe1 (Alchemist)22/28LGA 1851DDR5PCIe Gen 5.02024
Arrow LakeIntel 20ALion Cove (P-Core)
Skymont (E-Core)
Xe1 (Alchemist)24/32LGA 1851DDR5PCIe Gen 5.02024
Arrow Lake Refresh (Canceled)Intel 20ALion Cove (P-Core)
Skymont (E-Core)
Xe1 (Alchemist)TBDLGA 1851DDR5PCIe Gen 5.02025
Lunar LakeIntel 18ALion Cove (P-Core)
Skymont (E-Core)
Xe2 (Battlemage)8/8?LGA 1851?DDR5PCIe Gen 5.0?2024
Panther Lake (TBA)Intel 18ACougar Cove (P-Core)
Skymont (E-Core)
Xe3 (Celestial)TBDLGA 1851?DDR5PCIe Gen 6.0?2025
Nova Lake (TBA)TBACoyote Cove (P-Core)
Arctic Wolf (E-Core)
TBATBATBADDR5?PCIe Gen 6.0?2026
Razer Lake (TBA)TBATBATBATBATBATBATBA2027?

Intel Server CPU Roadmap

For servers, Intel plans to offer its first major architectural uplift in the form of Diamond Rapids which will be utilizing the 'Intel 3' process node. This node is expected to offer an 18% uplift in performance per watt and will utilize higher-performance libraries, optimized drive current, and metal stack. Intel states that it will have est wafers of their lead product (Xeon) running in their labs by the second half of 2022.

For the first time, Intel has also provided a first-look at its next-gen 18A powered Xeon CPU for the data center segment. This chip is shown with at least 17 tile blocks, 6 of which are CPU blocks.

The current Sapphire Rapids-SP Xeon CPUs feature 15 cores per CPU tile so an 18A chip with a similar core count will offer up to 90 cores though, by 2025, Intel would be offering more cores per CPU tile so we can definitely expect over 100 cores to match AMD's high-core count offerings in the server segment. Diamond Rapids on the '3' node is expected to offer up to 144 cores and 288 threads so 18A would definitely be offering a much higher core count. Intel has also confirmed that its Granite Rapid (P-Core) & Sierra Forest (E-Core) Xeon SKUs will be based on the 'Intel 3' process node.

Intel Xeon CPU Families (Preliminary):

Family BrandingDiamond RapidsClearwater ForestGranite RapidsSierra ForestEmerald RapidsSapphire RapidsIce Lake-SPCooper Lake-SPCascade Lake-SP/APSkylake-SP
Process NodeTBDIntel 18AIntel 3Intel 3Intel 7Intel 710nm+14nm++14nm++14nm+
Platform NameIntel Oak StreamIntel Birch StreamIntel Birch StreamIntel Mountain Stream
Intel Birch Stream
Intel Eagle StreamIntel Eagle StreamIntel WhitleyIntel Cedar IslandIntel PurleyIntel Purley
Core ArchitecturePanther Cove-XDarkmontRedwood CoveSierra GlenRaptor CoveGolden CoveSunny CoveCascade LakeCascade LakeSkylake
MCP (Multi-Chip Package) SKUsYesTBDYesYesYesYesNoNoYesNo
SocketLGA XXXX / 9324LGA 4710 / 7529LGA 4710 / 7529LGA 4710 / 7529LGA 4677LGA 4677LGA 4189LGA 4189LGA 3647LGA 3647
Max Core CountTBDUp To 288Up To 128Up To 288Up To 64?Up To 56Up To 40Up To 28Up To 28Up To 28
Max Thread CountTBDUp To 288Up To 256Up To 288Up To 128Up To 112Up To 80Up To 56Up To 56Up To 56
Max L3 CacheTBDTBD480 MB L3108 MB L3320 MB L3105 MB L360 MB L338.5 MB L338.5 MB L338.5 MB L3
Memory SupportUp To 16-Channel DDR5?TBDUp To 12-Channel DDR5-6400
MCR-8800
Up To 12-Channel DDR5-6400Up To 8-Channel DDR5-5600Up To 8-Channel DDR5-4800Up To 8-Channel DDR4-3200Up To 6-Channel DDR4-3200DDR4-2933 6-ChannelDDR4-2666 6-Channel
PCIe Gen SupportPCIe 6.0?TBDPCIe 5.0 (136 Lanes)PCIe 5.0 (88Lanes)PCIe 5.0 (80 Lanes)PCIe 5.0 (80 lanes)PCIe 4.0 (64 Lanes)PCIe 3.0 (48 Lanes)PCIe 3.0 (48 Lanes)PCIe 3.0 (48 Lanes)
TDP Range (PL1)TBDTBDUp To 500WUp To 350WUp To 350WUp To 350W105-270W150W-250W165W-205W140W-205W
3D Xpoint Optane DIMMTBDTBDDonahue PassTBDCrow PassCrow PassBarlow PassBarlow PassApache PassN/A
CompetitionAMD EPYC VeniceAMD EPYC Zen 5CAMD EPYC TurinAMD EPYC BergamoAMD EPYC Genoa ~5nmAMD EPYC Genoa ~5nmAMD EPYC Milan 7nm+AMD EPYC Rome 7nmAMD EPYC Rome 7nmAMD EPYC Naples 14nm
Launch2025-2026202520242024202320222021202020182017

Deal of the Day